Stop water and energy pouring down the drain and prevent bathroom floods       Contact us on +44 (0)20 7793 2260

US orders: For USA, Canada & Mexico go to Flowban.net For Far Eastern Countries contact us for more info

News & Exhibitions

See us at The Listed Property Show at Olympia

18th-19th February 2012 ...more

The Sleep Event

Nov 23rd-24th 2011 ...more

Nova-Flo® secures further patents

26th October 2011 ...more

Vince Cable MP launches Nathu Puri Engineering and Enterprise Institute at LSBU

26 July 2011 ...more

London Ritz hotel installs Nova-Flo®

15th April 2011 ...more

Nova-Flo® listed as PHPI 'Top Product'

01 Dec 2010 ...more

Daphne Guinness sued over 'constantly overflowing bath'

20 Oct 2010 ...more

Nova-Flo® inventor exhibits demonstrator at Mayor's ' Story of London Festival'

1st October 2010 ...more

Basins can now be protected from flooding.

17th Aug 2010 ...more

The Flooding Stories section is now live! Tell us your story.

9th July 2010 ...more

Nova-Flo® - Associate sponsor for 2010/11 Considerate Hoteliers Association Awards

2nd June 2010 ...more

See Roger Bisby's Nova-Flo® review for Professional Builder Magazine

10th March 2010 ...more

Princess Anne visits the Hft smart house

9th March 2010 ...more

More

Installation guide

We recommend Nova-Flo® be fitted by a competent plumber. The water supplies to the bath must be shut off prior to work commencing.

_____________________________________________________

Installation Step 1

Step 1. Trim the existing overflow pipe to allow a smooth path to the Nova-Flo® unit.

(Parts are supplied to allow for different size overflow pipes)

_____________________________________________________

Installation Step 2

Step 2. Calculate and cut two lengths of 22mm pipe and attach to the tap water connections.

(Always use a pipe cutter to cut the pipes. Do not use a hacksaw as this causes damage to the push-in fittings upon insertion)

_____________________________________________________

Installation Step 3

Step 3. Trim the lower overflow pipe and attach to the lower Nova-Flo® barb fitting.

_____________________________________________________

Installation Step 4

Step 4. Connect the hot and cold water supplies (either way around) using push-fit flexy hoses.

_____________________________________________________

Complete installation

Completed Nova-Flo® assembly.

_____________________________________________________

Technical Information

The above image shows a typical completed Nova-Flo® installation for bath mounted taps.

With the confined space behind a bath, compression fittings are unsuitable since there is limited room to swing a spanner. Push-in pipe connections are the obvious solution for ease of installation. Apart from the connections to the taps, every other pipe join simply pushes together.

Hot or cold supply pipes can be fitted to either side of Nova-Flo® to eliminate any guesswork.

As standard, Nova-Flo® allows for 22mm pipework (or using 15mm with an enlarger). Internal bore dimensions run at 17mm so it can be used with pressure pumps, power showers or simply a header tank with no loss of performance.

The width between the pipe connections on Nova-Flo® has been designed to accommodate bath mounted tap supplies of 180mm. Other taps such as wall mounted or overflow-fillers will require an an adaption of the plumbing pipework.

Please note that you may need to purchase relevant plumbing connections to connect a Nova-Flo® unit which are not supplied. We can advise on these and supply you with recommended fittings if required.

Installation time is generally under one hour for bath mounted taps.